Zone de Texte: EPPO PRA decision-support schemeStructure Ellipse: Initiation
Reasons for doing a PRA
Definition of PRA area Ellipse: Risk Assessment
Probability of introduction (pathway, detection, survival in transit)
Probability of establishment (host-plants, climate, vectors)
Economic impact assessment (direct/indirect damage)

Categorization as a quarantine pest Ellipse: Risk Management
Acceptable risk?
For each pathway identified:
Identification of possible phytosanitary measures
Efficacy of these measures

Proposed phytosanitary measures

Previous
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19 
Next